January 27, 2010

Your lifts get all growed up :)

Starting Feb. 1, we’ll be trying a progressive wave cycle. For this program it is going to be important that you have a 1 rep max for both your Deadlift and Press, as we are going to use that number to get the work weight for sets. This program was in Pavel Tsatsouline’s Power To The People (PTP) and was modified by CF 603.

Friday the 29th we are going to be doing a max DL and Press day 1-1-1. Since we  will a 1RM for both the deadlift and press, it’ll be easy to get a rough estimate of where you should start. It is important to have this number so that we can use this program effectively. If you do not get a new on on Friday, we will have to go with whatever your most recent max was.

This cycle is going to have the main focus of making these 2 lifts STRONGER.

This programing will be much different than our normal programing and is very strength biased. That being said, I want all of your feedback, as this will be a slower growth time for us, we will not be as “metcon” challenged during this stint, and it may become somewhat boring to some of you who are metcon addicted,  the program will be scheduled Mon-Friday with a metcon treat on Sat.

You should not be sore from these workouts. In fact, the first few workouts will probably be easy. It does get harder, though. Don’t discount the frequency at which you are performing these movements. Four to five times a week is a LOT. To make up for the fact that we are lifting sooo much, we will have buy ins,cash-outs, Olympic lifts, gymnastics, and some tasty met-cons, but in the next 4+ weeks is: get stronger. A LOT stronger. Don’t overreach, get greedy, or lose patience. This is a slow progression, but very effective in building strength. With a stronger pull and press, you’ll find things that used to be hard, easier.

As many rounds as possible in 20 minutes:

400 meter run

2 rope climbs

Post number of rounds to comments.

  • Share/Bookmark

Comments:

Total 21 Comments posted